PENGARUH JUMLAH TENAGA PENDORONG TERHADAP KECEPATAN LORI PADA PENGANGKUTAN KAYU
Abstract
This investigation was carried out in the: Padangan Forest District, Perum Perhutani Unit II, East Java, employing crews of various sizes, i.e., 4, 5 and 6 men to push the loaded lorries.
Lorry speed is influenced by several factor, e.g., slope, crew size, team-work among crew members. The influence of crew size on lorry speed turned out to be insignificant.
The average speed of lorries are 3.3 km/hour, 4.7 km/hour, and 4.3 km/hour with standard error of 0.7 km/hour, 0,8 km/hour and 0,9 km/hour for 4, 5 and 6 man, crew, respectively.Keywords
Full Text:
PDF (Bahasa Indonesia)References
Brown, N.C. 1949. Logging. John Wiley & Sons, Inc. New York.
Suharto, R.M. 1957. Pemilihan pengangkutan dengan jalan rel dan jalan mobil di Jawa. Rimba Indonesia VI (1-2): 8-93.
DOI: https://doi.org/10.20886/jphh.1985.2.1.13-14
Refbacks
- There are currently no refbacks.
JURNAL PENELITIAN HASIL HUTAN INDEXED BY:
Copyright © 2015 | Jurnal Penelitian Hasil Hutan (JPHH, Journal of Forest Products Research)
eISSN : 2442-8957 pISSN : 0216-4329
JPHH is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.