ANALISIS BIAYA DAN TENAGA KERJA PADA BEBERAPA KILANG PENGGERGAJIAN DI SUMATERA SELATAN
Abstract
The result of research on several sawmills in South Sumatera showed that average level of manager productivity is 7.563 Cu.m/man/annum, administration productivity is 3.220 Cu.m/man/annum, tecnician productivity is 74 Cu.m/man/annum. Average labor requirements are 9 men/1.000 Cu.m of the design capacity and 10 men/1.000 Cu.m of raw material.
Cost of production of sawntimber showed an average of Rp 184.808,-/Cu.m, in which the processing cost alone ranked high up to an average of 83 %, marketing cost 10 %, and general cost 7 %. Profit generated of each mill per annum ranged from Rp 891.060.692,- to Rp 3.165.279.700,- or equivalent to an average of Rp 80.053 per Cu.m.
Full Text:
PDF (Bahasa Indonesia)References
Abdurachman, A.J. & Sylviani, 1987. Produktivitas tenaga kerja pada beberapa kilang kayu lapis di Sumatera, Jurnal Penelitian Hasil Hutan 4(2).
Arifin. Z, S. Sastrodimedjo & I.Tawakal, 1987. Penyediaan tenaga terampil untuk lndustri Perkayuan. Diskusi Industri Perkayuan, Jakarta.
Blalock. J, 1982. Social Statistic, Mc Graw-Hill Books Co., Toronto. pp 77-85.
Mulyadi, 1978. Akutansi biaya BPFE UGM Yogyakarta. pp 20-40.
Sanusiputra S.H & Rochyadi D, 1982. lndustri kayu dan peranannya untuk kesejahteraan masyarakat. Seminar Pulang Kandang Fakultas Kehutanan IPB. Bogor.
Tandiono, 1982. Peningkatan Efisiensi Dan Produktivitas Industri Perkayuan, Proceeding Diskusi Industri Perkayuan Jakarta. Balai Penelitian Hasil Hutan, Bogor.
DOI: https://doi.org/10.20886/jphh.1990.7.4.150%20-%20155
Refbacks
- There are currently no refbacks.
JURNAL PENELITIAN HASIL HUTAN INDEXED BY:
Copyright © 2015 | Jurnal Penelitian Hasil Hutan (JPHH, Journal of Forest Products Research)
eISSN : 2442-8957 pISSN : 0216-4329
JPHH is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.