ANALISIS.KERAPATAN JALAN HUTAN BERDASARKAN HASILPENAFSIRAN FOTO UDARA DAN SURVEl LAPANGAN: STUDI KASUS PT.INHUTANI II
Abstract
Forest road network has a very important role in tranaporling logs fram the frest to processing site or logyard. The investigation of forest road density by using theaerial photo of l : 20.000 and 1: 60.000 scales had been conducted.The scope of the aerial photo is the second five-year working plan of PT. lnhutani 11 Pulau Laut, South kelimanten.
The results are. as follows :
1.Based on aerial photo interpretation, forest road density is 7,6 m/ha.
2.Based on average skidding distance, and road construction and road maintenance costs, road denvities ha and 17,4 m/ha. respectively.
3. Actual forest road density in PT. lnhutani II forest area is not optimum yet because it is far less than optimum values resulted from calculation based on average skidding distance and road construction and maintenance costs.
Full Text:
PDF (Bahasa Indonesia)References
Bends, M.dan ake jarvholm.1970. logging and trane-
Portation Troipcal High Forest. Stockholm.
FAO. Harveating man made forest ia developing
countries. A manuall on tecbniques, rosde, produc-
tion and costs. FAO, Rome, 1976.
DOI: https://doi.org/10.20886/jphh.1991.9.2.53-58
Refbacks
- There are currently no refbacks.
JURNAL PENELITIAN HASIL HUTAN INDEXED BY:
Copyright © 2015 | Jurnal Penelitian Hasil Hutan (JPHH, Journal of Forest Products Research)
eISSN : 2442-8957 pISSN : 0216-4329
JPHH is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.